nitial Incident

Stop Work Order

2023

​DATE ISSUED
​REFERENCE
​DETAILS
​24 February 2023
SHENA/LGL/1.2 (83)​Unsafe working at height activities​
​2 March 2023
​SHENA/LGL/1.2 (84)

Conduct radiation maintenance without licence

​2 March 2023
SHENA/LGL/1.2 (85)
Possession of unlicensed controlled apparatus



2022

​DATE ISSUED
​REFERENCE
​DETAILS
​18 February 2022
SHENA/LGL/1.2 (63)​

Seriously unsafe work practices and poor hazard management within laboratory 

​24 February 2022
​SHENA/LGL/1.2 (64)

Improper hazard management, unsafe work practices, poor equipment standards and inadequate personnel safety practices by construction workers 

​11 March 2022
SHENA/LGL/1.2 (65)
Improper hazard management, unsafe work practices, and inadequate personnel safety practices by construction workers
​23 March 2022
SHENA/LGL/1.2 (69)
Unsafe Lifting equipment
​21 June 2022
SHENA/LGL/1.2 (74)​Seriously unsafe condition of mobile cranes and equipment not certified
​21 June 2022
SHENA/LGL/1.2 (75)
Seriously unsafe work at height practices and electrical arrangements
​6 July 2022
SHENA/LGL/1.2 (77)
​Unsafe working at height​
​9 August 2022
SHENA/LGL/1.2 (78)
Unsafe working at height​
19 July 2022
SHENA/LGL/1.2 (79)
​Unsafe working at height and electrical managements
​21 July 2022
SHENA/LGL/1.2 (80)
Unsafe working at height​
8 August 2022
SHENA/LGL/1.2 (81)
​Unsafe working at height
​22 September 2022
SHENA/LGL/1.2 (82)
Unsafe working at height



2021

​DATE ISSUED
​REFERENCE
​DETAILS
​7 April 2021
SHENA/LGL/1.2 (37)​​Non-compliance to Workplace Safety and Health Order, 2009 and the regulations made thereunder
​8 May 2021
​SHENA/LGL/1.2 (40)
Fatality “dropped object” Incident work onsite stopped
​16 June 2021
SHENA/LGL/1.2 (44)​Non-conformance related to general safety of the workplace, hazard management, unsafe work practices, poor equipment standards and inadequate personnel safety practices by construction workers in relation to working at height
​5 July 2021
SHENA/LGL/1.2 (45)
​Construction site of proposed 2-storey detached house is working and identify non-conformance to working at height, also absence of site supervision by qualified and competent person
6 July 2021​
SHENA/LGL/1.2 (46)
Unauthorised lift contractor
​2 August 2021
SHENA/LGL/1.2 (47)
​Unsafe condition at proposed double storey house construction site
​24 September 2021
SHENA/LGL/1.2 (56)

Construction site of proposed 5 block shophouses and residences. identified non-conformance to working at height management, and also the absence of qualified and competent WSH Coordinator onsite

​27 October 2021
SHENA/LGL/1.2 (52)

Non-compliance to work at height practices and equipment not certified for man-riding​

​2 November 2021
SHENA/LGL/1.2 (54)

Construction site of proposed warehouse. Unsafe work at height activities and inadequate risk management controls onsite

​3 November 2021
SHENA/LGL/1.2 (55)

Inadequate control measures and fatality incident due to being hit by moving object

​6 December 2021

SHENA/LGL/1.2 (59)

Non-compliance and unsafe work at height and lifting activities at construction worksite



2020


​DATE ISSUED
​REFERENCE
​DETAILS
​9 January 2020
SHENA/LGL/1.2 (10)​​Unsafe condition of worksite at the proposed Shopping Complex and Shophouses construction workplace
​27 January 2020
​SHENA/LGL/1.2 (11)
Unsafe condition of worksite at proposed Shopping Mall, Hotel, Apartments and Multipurpose Hall construction workplace ​
​8 February 2020
SHENA/LGL/1.2 (13)​
​Unsafe condition of worksite at proposed 12 unit walk-up flat construction workplace
​22 May 2020
​SHENA/LGL/1.2 (16)
A cargo loading lift incident at an established shopping department store which resulted in the death of one person
​29 May 2020
​SHENA/LGL/1.2 (16)
​Unsafe condition of the cargo loading lift (design integrity) at an established shopping department store
​16 June 2020
SHENA/LGL/1.2 (18)​​Unsafe condition of construction site at proposed 5 units 2 storey houses
​18 June 2020
​SHENA/LGL/1.2 (19)
​Unsafe condition of construction site at proposed 2 Blocks of 4-Storey Apartments (24 Units)
10 July 2020​
​SHENA/LGL/1.2 (20)
​Unsafe condition of worksite of proposed 2 units of 3 storey terrace houses. Unsafe condition of worksite of proposed 32 units of 3 storey shophouses 
​13 July 2020
​SHENA/LGL/1.2 (21)
​Unsafe condition of worksite of proposed 2 units of 3 storey terrace houses
​13 July 2020
​SHENA/LGL/1.2 (22)
Unsafe condition of worksite ​
​24 August 2020
SHENA/LGL/1.2 (26)
Concern on man-riding basket supported by a tower crane for routine operations
​4 September 2020
SHENA/LGL/1.2 (27)
Collapse of riser during commissioning works
​4 September 2020
SHENA/LGL/1.2 (28)
Unsafe accomodation for the workers



2019


​DATE ISSUED
​REFERENCE
​DETAILS
​3 June 2019
SHENA/LGL/1.2 (1)Unsafe use of mobile crane for lifting activities at construction workplace
4 July 2019
SHENA/LGL/1.2 (3)
Electrocution fatality at a construction workplace
7 September 2019
SHENA/LGL/1.2 (4)
Serious non-conformances related to general safety of the workplace, hazard management, unsafe work practices, poor equipment standards and inadequate personnel safety practices at a construction workplace
26 November 2019
SHENA/LGL/1.2 (8)
Serious deficiency in Confined Space Entry Procedures at an agricultural workplace
​25 November 2019
​SHENA/LGL/1.2 (7)
Unsafe Work at Height activities at a construction workplace



2018


​DATE ISSUED
​REFERENCE
​DETAILS
1 February 2018
(208)EID/HSSE/2.3 Pt.3
PJB/OSH/SWO/PT.1
Wrongful occupation of temporary accommodation at a COMAH Facility
28 March 2018
(222) EID/HSSE/2.3 pt 3
Inadequate assurance on asset integrity at a COMAH Facility
5 April 2018
(231) EID/HSSE/2.3 PT 3
Unsafe crane activity at a COMAH Facility 
5 April 2018
(228)EID/HSSE/2.3 pt 3
Unsafe use of Lifting equipment at a COMAH Facility
8 October 2018
(279) MEMI/HSE/2.3 Pt. 4 
Improper use of Mechanical Digger Equipment for Lifting and Supporting of Pipe at a COMAH Facility